New Life to Old Stones

The ruin is coming together faster, as the floors and ceilings are built in the classic Alentejo style, logs and pine.

Second and third floor waiting for the new floor/ceiling structure. The fireplace is hanging in the air supported by the walls. When the floor structure is added this week it will follow the line of plaster creating two floors. The stairs will be built to connect the the floors as soon as the floor structure is complete.

Exposed stones of the wall and the new ceiling in the sitting room.

Future kitchen wall, exposed boulder will be cleaned and remain a focal point.

The exterior facing the garden is almost finished. Next steps to be classic white paint, doors and windows. The upper glass doors will eventually have an iron balcony.

Front of the house waiting for paint.

Leave a Reply

Your email address will not be published. Required fields are marked *